01 / THE CHALLENGE
A roof decision shaped
by the building below.
The medical center’s aged modified-bitumen roofs showed severe granule loss and occasional leaks. Full replacement would have added disruption to an occupied, high-traffic medical environment.
02 / THE RAMTECH APPROACH
Evaluate. Prepare. Restore.
Ramtech assessed the roof and operating constraints, used cores to confirm substrate conditions, repaired leak points and vulnerable details, and prepared the surface for a high-solids silicone restoration.
03 / THE RESULT
More life from the existing roof.
The 76,647-square-foot roof was restored without full tear-off, with minimal disruption to medical operations and a 20-year labor-and-material warranted system.